| << Previous 309 E Green St (9 photos) | | | Wednesday Night Next >> |
Date captured: Monday, June 9, 2008.





Date posted: June 10, 2008.
Filed under: Burnham 310, Champaign, Construction.
This entry is a mini photo thread.
What is up with the orange paint?
I sure hope that is some kind of weatherproofing to go under brick and not an exterior color!
I'd love to see more updated pics of this place.
Hey, That's me on that swing stage in the white shirt. I'm direct applying synthetic stucco which has a texture to simulate limestone on the east shear wall. It was a big challenge to do this work off a swinging platform. This wall alone was about 6000 square feet. I'm proud of what I've done here. As a union plasterer from Chicago I leave my workmanship to Champaign. Glad I got to work on this project!